Upgrade of the Karratha Airport Electrical Distribution (High and Low Voltage Power) System.
The upgrade included the phased replacement of the existing 11kV systems with 33kV systems to remove current and future capacity constraints at the airport and replace old equipment that is at the end of its design life.
The work also included the replacement of old and degraded 415V distribution cabling.
Project Stats: Value: $7.3m